The people who run California's grid are writing new rules for the biggest electricity users in the state. Those rules show how much the grid is being asked to carry.
What California's grid operator is proposing
The California Independent System Operator (CAISO) posted a draft final proposal for its Large Loads Initiative on September 24, 2026. A stakeholder meeting followed on October 1, comments were due October 15, and CAISO expects to bring it to its Board of Governors on October 28. The proposal covers technical standards for reliability, preventing cost-shifting, and a framework for faster interconnection of big new loads.
Who counts as a large load
In its earlier straw proposal, CAISO defined a large load as a single site with a peak demand of 50 megawatts or more, according to Mgrid's coverage. That is the scale of a big data center campus, not a home.
Flexible service, in plain terms
One proposed option, called FILI, would let a large load connect at a curtailable level while network upgrades are built, then move to firm service later. Curtailable means its power could be reduced when the grid is tight. Nothing is final. CAISO, FERC and the utilities would all have to act before any of it takes effect.
What it means for your home
A data center can be designed to dial down at peak times. Your home cannot tell the family to skip dinner when the grid is stressed. The proposal also lists preventing cost-shifting as a goal, which suggests regulators know large new loads can affect what other customers pay. Whether it works is something to watch, whether you are with SCE, SDG&E or PG&E.
How third-party ownership (TPO) works
In a TPO program, a company installs, owns and maintains the solar and battery system at your home. You pay for the power it produces without buying, leasing, or financing equipment. Many programs are designed to come in below utility rates, with savings of up to 40% depending on your home and program.
Here is what a TPO solar and battery program can offer:
-Backup power when the grid goes down
-Stored solar to use in the evening peak
-Less of your power bought at peak-time rates
-Maintenance handled for the term
-Big users can be told to power down. Your home runs best when it has its own reserve.
To find out if your home qualifies for a TPO solar and battery program, visit myhomesolution.org
CAISO, Large Loads Initiative draft final proposal notice (Sep 24, 2026): https://www.caiso.com/notices/large-loads-initiative-draft-final-proposal-and-draft-tariff-language-posting-meetings-on-10-1-26-and-10-19-26
Mgrid, CAISO answers FERC with two flexible interconnection services and a 50 MW large load definition (Aug 18, 2026): https://mgrid.org/2026/08/18/caiso-answers-ferc-with-two-flexible-interconnection-services-and-a-50-mw-large-load-definition/